Traditional style villas
 
Move
Rear Aspect
  • Rear Aspect
    Rear aspect, terrace and patio.
  • Rear Aspect
    Rear aspect from road
  • Roof Terrace
    Roof terrace, walls capped and tiles laid
  • Mezzanine Area
    Mezzanine area above living room with internal stone wall, wooden roof beams, peep hole to kitchen
  • Mezzanine Area
    Mezzanine area with plaster finish walls and light window
  • Rear Terrace
    Rear terrace and BBQ area
  • External Landscaping
    External landscaping, paved patio and pathway
  • External Landscaping
    External landscaping, paved pathway and low wall
  • External Landscaping
    Paved areas and access steps
  • External Landscaping
    What shall we do here?
  • Boiler Room
    Boiler room and garage

  • DSC 0345
    Exterior pointing being applied.
  • DSC 0346
    Exterior pointing being applied.
  • DSC 0351
    Exterior pointing being applied.
  • DSC 0352
    Exterior pointing applied.
  • DSC 0340
    Internal plastering
  • DSC 0334
    Ben, Vamos Villas

  • DSC 0253
    Roof apex constructed.
  • DSC 0255
    Placement of the main roof beams.
  • DSC 0280
    Supporting timbers cut to size.
  • DSC 0286
    Ceiling boards, felt, batons and insulation laid.
  • DSC 0306
    Roof tiles in place.

  • Cornerstone
    First stones laid. Measuring out for doors and stone guttering.
  • Few days later
    Building up the walls. Outline beginning to take shape.
  • Maestros
    The 'A' Team - Krenar, Gonzales & Albert.
  • Balcony
    Balcony built up. Pipework added for 'future' development. Walls growing.
  • Stairs
    Roof terrace stairs with stone arch and storage space.
  • Wow
    Take it all in.
  • Access
    Side access stair case to terrace.
  • Top steps
    Top steps being placed for roof terrace.
  • Beams
    Ceiling beams for flat roof area. At far end supporting floor beams for Mezzanine floor.
  • View
    Rear and side view.
  • Maestros
    Krenar (left), Andreas (center), Gonzales (right)
  • Troyjune 0013
    Front aspect
  • Troyjune 0014
    Rounded verandah wall
  • Troyjune 0016
    Fireplace and arched patio doors
  • Troyjune 0021
    Stone guttering
  • Troyjune 0022
    Kitchen area.
  • Troyjune 0024
    Mezzanine floor beams
  • Troyjune 0028
    Front porch and recess area

  • Establishing the location
    Establishing the location and marking out.
  • Foundations
    Completed foundations steel reinforced concrete.
  • Basement wall.
    Base level wall.
  • Footprint
    Villa and terracing foundations infilled to the base height of villa.
  • Storage room
    Storage room added to provide better support under balcony. Will be used as collection point for water pipes and electric cabling.
  • Insulation
    Damp proof membrane, insulation, steel layed prior to pouring concrete for villa floor. Same technique previously applied to surrounding terrace area.

Rear Aspect
 
 

Use the controls above to navigate the slideshow. The thumbnail gallery can be moved or dragged using your mouse.